JAKARTA - The Bogor-Ciawi-Sukabumi or Bocimi Toll Road has been open since the Eid 2023 holiday. The Ministry of Public Works and Public Housing (PUPR) hopes that the opening of the Bocimi Toll Road section 2 during the 2023 Eid momentum can reduce congestion and support smooth homecoming.

The Bocimi Section 2 toll road itself was inaugurated by President Joko Widodo (Jokowi) on August 4, 2023.

However, not even 1 year after being inaugurated, the toll road has claimed victims. The reason is, there has been a landslide on the Ciawi Sukabumi (Bocimi) Toll Road KM 64 towards Sukabumi on Wednesday night, April 3, 2024. This incident had an impact on lane 1 of the Bocimi Toll Road.

PT Trans Jabar Tol (TJT) as the owner of the Bocimi Toll Road concession is conducting security at the scene and diverting traffic around the scene.

"Vehicles from Ciawi to Parungkuda were diverted out in Cigombong. Access from Parungkuda to Ciawi was temporarily closed to avoid additional landslide potential," he quoted a written statement, Thursday, April 4.

It is suspected that the landslide occurred due to water bursts due to heavy rainfall around the location.

"Currently, the management of PT Waskita Karya (Persero) Tbk and PT Waskita Toll Road are conducting a site review to ensure handling and see the condition of the entire Bocimi toll road," he said.

As a result, a car containing two passengers who were passing by fell. According to information, the two people had been evacuated and given medical action.

Quoting the official website of the Toll Road Regulatory Agency (BPJT) of the Ministry of PUPR, overall the Bocimi Toll Road has a length of 54 kilometers (km) and consists of 4 sections.

Section 1 Ciawi-Cigombong along 15.35 km has been operating since December 2018. Then, Section 2 Cigombong-Cibadak along 11.90 km will be operated on August 6, 2023.

Then, Section 3 Cibadak-West Sukabumi along 13.70 km and Section 4 of the West Sukabumi-East Sukabumi along 13.05 km are currently still in the land acquisition stage.

The following is a complete list of Jakarta-Sukabumi Toll Tariffs:

Avoid Jakarta-Sukabumi Toll Tariffs

The Jakarta-Sukabumi toll road is part of the Trans Java toll road which is divided into two sections, namely the Jakarta-Bogor-Ciawi (Jagorawi) toll road and the Ciawi-Sukabumi (Bocimi) toll road.

Toll Road Jakarta-Bogor-Ciawi

For those of you who want to use the Jakarta-Sukabumi Toll Road, here are the details of the Jakarta-Bogor-Ciawi toll road tariff based on the vehicle group.

- Group I: IDR 7,000

- Group II: IDR 11,500

- Group III: IDR 11,500

- Group IV: IDR 16,000

- Group V: IDR 16,000

Ciawi-Sukabumi Toll Road

For this toll road, there are 3 entrance gates and 3 exit gates. The entrance gates are at the Cigombong Interchange, Ciawi and Ciawi Interchange. For those of you who want to use the Jakarta Sukabumi toll road, here are the details of the Ciawi-Sukabumi toll tariff.

Entrance Gate: Ciawi

Exit Gate: Cigombong Interchange

- Group I: IDR 14,000

- Group II: IDR 21,000

- Group III: IDR 21,000

- Group IV: IDR 28,000

- Group V: IDR 28,000

With the above tariff, the total Jakarta Sukabumi tariff can be calculated via the Bocimi Toll Road.

- Group I: IDR 21,000

- Group II: IDR 32,500

- Group III: IDR 32,500

- Group IV: IDR 44,000

- Group V: IDR 44,000


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)