JAKARTA - The Minister of Public Works and Public Housing (PUPR) reviewed the main venue field for preparations for the 2024 Aceh XXI PON.

Basuki said that the Ministry of PUPR through the North Sumatra Regional Settlement Infrastructure Center (BPPW) of the Directorate General of Human Settlements is currently building the Main Stadium of North Sumatra in Deli Serdang.

"The main stadium of North Sumatra was built to provide good sports facilities and infrastructure to support the successful implementation of the XXI 2024 PON in North Sumatra and Aceh Provinces," he said in a written statement, Friday, March 15.

Meanwhile, Head of the North Sumatra Regional Settlement Infrastructure Center (BPPW) of the Directorate General of Human Settlements Deva Kurniawan Rahmadi said the stadium located in Sena Village, Batang Kuis District, Deli Serdang Regency was built at a state budget cost of Rp587 billion. "Currently, the construction progress has reached 31.63 percent and is targeted for completion in September 2024 so that it can be used for the upcoming XXI PON," he said.

Deva said the construction of the North Sumatra Main Stadium was carried out by KSO PT Adhi Karya - PT PP - PT Penta as the implementing contractor and PT Jaya CM and PT Cirajasa KSO as the construction management.

It is known, this stadium was built on an area of 48,420 square meters with a building area of 27,452 square meters.

"This stadium will consist of 3 tribune floors with a total capacity of 25,750 spectators. For VIP spectators 365 units, media 224 units, regular 25,115 units and disabled 46 units," he said.

The scope of work includes preparation for the K2 management system, stadium buildings, individual seats, signage work, turnsite work, field of play (FOP) work and infrastructure work.

Then, there are outside work, fences around the site, outdoor utility work, PLN substations, PLN connection and water and telephone connection.

"Until now, bore pile work has been carried out, lower structure (pilecap and tiebeam), lower structure (floor column 1), FOP, retaining walls and canals and precast fabrication have been carried out," he said.


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)