The Bogor City One-Division System Will Be Implemented Again After The Otista Bridge Opens
BOGOR - The One-way System (SSA) in the Bogor Botanical Gardens circle will be reinstated after the Otista Bridge on Otto Iskandardinata Street (Otista) is reopened after the stages of the rebuilding and road-function-worthy testing have been completed.
This was conveyed by the Mayor of Bogor, Bima Arya after a coordination meeting and field check with the Bogor City Forkopimda last week.
"We make sure that the One-way system will still be implemented. So there will be no change again, so there are no two directions," Bima Arya said in his statement, Wednesday, December 13.
Currently, the traffic scheme continues to be socialized to the wider community. Later in re-implementing the SSA, the traffic signs needed will be installed.
"Later on Dishub and friends Then under the coordination of the Chief of Police, Mr. Kasat Then will ensure the placement of the signs needed where the points are," he said.
Bima Arya also asked the Bogor City Transportation Agency to really coordinate with the Bogor City Police Traffic Unit to carry out potential buildup and slow down traffic on the SSA route after the Otista bridge was opened.
Because with the enlargedness of the Otista bridge, the flow of vehicles from the direction of Tugu Kujang will flow rapidly on the Otista Bridge, which was originally a point of congestion due to a bottleneck.
"Ya artinya tidak boleh ada ngetem sembarang, parkir sembarang, karena nanti juga akan ada pola baru pengaturan parkir 90 derajat 45 derajat dan lain-lain itu akan terus dissocialisasikan," katanya.
Currently, the process of rebuilding the Otista Bridge on Jalan Otto Iskandar, Bogor City is running on the track or according to the plan by taking all the procedures that must be passed to ensure that theworthy bridge is used according to existing regulations.
"Well, therefore, we make sure there are stages to ensure the strength of the concrete," said Bima Arya.
To enter the stage like a concrete age road function, you must be at least 21 days to 28 days old to be able to carry out a load test.
"So once the concrete age is sufficient, it is estimated that on December 15, we plan to carry out a load test phase. So there are rules, we have to go through like that," he explained.
SEE ALSO:
After all the road functions are passed, it will then be determined that the road can be used and passed by vehicles.
While waiting for the age of the concrete to be tested for road function, currently there is also a procession on the bridge's wing with road compactification being carried out.