シェア:

Bandung Police deployed 310 personnel to secure a series of tests for the function of the Jakarta-Bandung High Speed Rail (KCJB) project by PT Kereta Cepat Indonesia China (KCIC).

Bandung Police Chief Kombes Kusworo Wibowo said the KCJB project began to be electrified on Thursday (18/5).

Then on Friday (20/5), according to him, the inspection train began to travel to comb through the bearings that the high-speed train would pass.

"Hopefully, with the joint West Java Regional Police personnel from the Bandung Police with the West Java Police Mobile Brigade (Brimob) can make this KCIC development effective", said Kusworo as quoted by ANTARA, Wednesday, May 17.

In addition, Kusworo said hundreds of police were deployed to anticipate criminal acts that could potentially occur within the scope of the KCJB project, including the theft of project materials that could hamper work.

"The theft, although small in nature, is a bolt or cable or copper, but it can have a big, dangerous impact, it can result in a train accident," he said.

Currently, according to him, the safety wall and surveillance cameras are still being built by the project. So Kusworo said the potential for criminal acts according to him was still there.

According to him, the security of the KCJB project will be carried out by police personnel for the next three months, or the first high-speed train in Southeast Asia is 100 percent functioning.

"So that the operation of this high-speed train can take place and be carried out according to the set schedule," he said.


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)