Mataram Walkot Absent From The NTB Prosecutor's Office Call, Tomorrow It Will Be The Regent Of West Lombok Examined
NTB - The West Nusa Tenggara (NTB) High Prosecutor's Office (Kejati) summoned two regional heads regarding the alleged corruption of physical projects and levies on PT Air Mineral Giri Win (AMGM).
The head of the NTB Prosecutor's Office, Nanang Ibrahim Soleh, said that the two regional heads would be investigated regarding capital participation from the Mataram City Government and the West Lombok Regency Government to PT AMGM.
"Today we summoned the Mayor (Walkot) of Mataram, but the person concerned was unable to attend. The Regent of West Lombok, it will be (the inspection agency) tomorrow," he said in Mataram, NTB, Monday, June 19, confiscated by Antara.
Meanwhile, in the same case, the Director of PT AMGM Lalu Ahmad Zaini fulfilled the summons for an examination by the NTB Prosecutor's Office today, Monday, June 19. Then Ahmad was examined from 09.00-13.00 WITA.
Assistant for Special Crimes at the NTB Prosecutor's Office, Ely Rahmawati, explained that the physical project was related to the installation of buildings and water installations and water levies.
In handling it under the control of the special criminal field, he believes that the problem is still at the stage of collecting data and information.
This case also entered the investigating table of the NTB Prosecutor's Office starting from a public report. In the report, the problematic project is related to the management of the 2019-2020 budget.
According to reports, the work was related to the installation of a concrete panel fence at the Sembung "Water Treatment Plant" (WTP) and the procurement of wells at 10 location points.
VOIR éGALEMENT:
In addition, there are also allegations of corruption in the construction project of the production equipment building, salt building, reading section room, building and interior completeness of the PT AMGM Branch Office in Narmada, West Lombok Regency.
According to the reporter, there was a volume shortage in a number of project work items in 2019-2020 with a value of at least IDR 1 billion.
In addition, the complainant suspects that there has been misappropriation of the budget and abuse of positions related to the collection of waste retribution payments. According to the reporter, the collection of waste levies has been included in one account of the PT AMGM customer bill.