JAKARTA - The National Disaster Management Agency (BNPB) stated that flood management in Semarang City, Central Java, showed positive results after a number of technical and collaborative steps were carried out across agencies over the past week.
Deputy for Emergency Management of BNPB, Budi Irawan, said that the decline in standing water began to be seen at a number of points, especially in the northern region of Semarang.
"Alhamdulillah, all the plans that were realized yesterday have now been realized. Pumps are added, guarded, and monitored. In the downstream sector, they also continue to be addressed. We have even carried out weather modification operations with two planes," Budi said in a written statement in Jakarta, Sunday, November 2 night.
The improvement of the drainage route or the outlet of the Terboyo retention pond is the main focus because this location is a downstream that accommodates water flow from residential areas around it.
BNPB assesses that the disposal route in the Terboyo retention pond is one of the main factors causing flooding that hit Semarang, especially in the sea toll road construction area.
In addition to strengthening the downstream sector, BNPB also adds portable pump units at several inundation points and carries out intensive monitoring to ensure that the entire system runs optimally.
The puddle began to drain up to 65 centimeters. Kaligawe Street can be passed by two-wheeled vehicles," Budi emphasized.
The technical steps, he continued, were accompanied by close coordination with local governments, the TNI, Polri, and volunteers so that emergency response efforts took place quickly and paid attention to the safety of residents.
Meanwhile, Indonesian Vice President Gibran Rakabuming Raka who also visited the location with BNPB and Central Java Governor Ahmad Luthfi, appreciated the hard work of all parties who worked together in handling floods.
SEE ALSO:
“Perlu sinergi antara pemerintah pusat dan daerah. Harapannya, segera kita temukan solusi bersama. Terima kasih atas kerja keras selama seminggu ini,” ujar Wapres Gibran usai peninjauan di area pembangunan jalur tol laut dan kolam retensi Terboyo.
- https://voi.id/berita/528284/warga-pandeglang-diminta-mewaspadai-bencana-banjir-dan-longsor
- https://voi.id/berita/529602/lbh-jakarta-sebut-banjir-dan-macet-jakarta-bentuk-kegagalan-pemprov-dki-tata-kota
- https://voi.id/berita/528196/dki-jakarta-tingkatkan-kesiapsiagaan-hadapi-banjir
- https://voi.id/olahraga/484798/satu-grup-dengan-brasil-di-piala-dunia-u-17-2025-jadi-tantangan-dan-kesempatan-besar-timnas-indonesia
"There needs to be synergy between the central and regional governments. Hopefully, we will find a solution together soon. Thank you for the hard work this week," said Vice President Gibran after a review at the sea toll road construction area and the Terboyo retention pond.
The Vice President emphasized that flood management in Semarang must be a momentum to strengthen collaboration between agencies in accelerating the social and economic recovery of affected residents.
The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)