JAKARTA - Perum Jasa Tirta II (PJT II) ensures that water resources operations and maintenance (SDA) activities continue to run optimally during the 1447 Hijriah Eid al-Fitr holiday and holiday.
This is also related to the implementation of the 2026 Lebaran work from anywhere (WFA) policy for ASN, BUMN, and the private sector which is scheduled to take place on March 16-17, 2026 and March 25-28, 2026.
The President Director of Perum Jasa Tirta II, Imam Santoso, said that during this period, the company emphasized that the management of natural resources and environment was still carried out to the maximum through strengthening the monitoring system, increasing the readiness of personnel, and arranging operations in the field.
He added that this step was taken so that all functions of water resources management services would continue to run well.
Imam said that readiness efforts were carried out by arranging operational schedules and assigning personnel to various strategic infrastructure managed by the company, such as dams, water channel networks, to hydroelectric power plants (PLTA).
"Intensive monitoring continues to be carried out to ensure that all water management systems can function properly and anticipate various potential disruptions during the period," he explained in his statement, Friday, March 13.
In addition, he added that PJT II ensures that the supply of raw water remains stable to meet community needs.
According to him, the water operation arrangement is carried out in a planned manner so that the availability of raw water for the community and other strategic needs is still guaranteed safely and sustainably during the Lebaran period.
Imam said that maintaining the reliability of water resources services is the company's top priority, including during religious holidays and national holidays.
"During the Idulfitri holiday period, PJT II will continue to deploy operational teams in the field to ensure that all water resources infrastructure operates properly. Monitoring of dams, channels, and hydropower plants continues to be carried out so that services to the community are maintained," he said.
He also added that water resources management is a public service that must run non-stop.
According to him, operational readiness is an important factor in maintaining the reliability of the system and internal coordination between divisions and work units is also strengthened so that any potential disruption can be anticipated quickly and accurately.
In addition to monitoring the main infrastructure, PJT II also periodically monitors hydrological conditions by utilizing a reliable digital infrastructure system, and this is done to ensure that water operation arrangements can be optimally adjusted to existing needs.
"This step is part of the company's efforts to maintain a balance between water availability, service needs, and the sustainability of water resources management," he said.
Imam said that with solid collaboration between teams in the field and supporting units, as well as support from various stakeholders, PJT II continues to strive to ensure that water management services remain reliable during the holiday period.
"Through this readiness, it is hoped that the public can celebrate Eid al-Fitr and gather with their families comfortably, while the water management system continues to operate optimally," he concluded.
The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)