JAKARTA - Astra Infra Toll Road ensures its readiness ahead of the Eid al-Fitr 1446 Hijri or Lebaran 2025 holiday.

Vice President of Operational Policy & Governments Relations Astra Infra Novianto Dwi Wibowo said that his party had prepared infrastructure for all Astra Infra managed toll roads.

First, Astra Infra has installed 800 CCTV units on all toll roads operated during the Lebaran 2025 holiday. Second, install 7 traffic counter units.

"So, this traffic counter function is for us to be able to calculate in real time at certain points how many vehicles have passed by our toll road," said Novianto at the Astra Infra Group Media Gathering event which was monitored online in Jakarta, Thursday, March 13.

"Well, this is useful for collaborating with the Korlantas Polri when there are certain points the number of vehicles passing by and taking ways of acting that we have scenarioed together with the police," he added.

Third, said Novianto, Astra Infra has also prepared a call center for 24 hours. Fourth, Astra Infra has also alerted around 1,300 personnel during the Eid 2025 period.

Finally, Astra Infra will operate 120 units of operational vehicles.

According to Novianto, his party will continue to collaborate and coordinate with all stakeholders to always provide the best service during the Lebaran 2025 homecoming period.

"Astra Infra is committed to preparing asset conditions for Lebaran 2025 services, including ensuring road conditions are in prime condition, anticipating flooding, supported by facilities and infrastructure as well as personnel who are on standby 24 hours," he added.

To note, currently the length of the Astra Infra Toll Road managed toll road reaches 396 kilometers (km). This toll road is located in Trans Java and Metro.

The details, in Trans Java covering the Tangerang 'Merak (72.5 kilometers), Cikopo' Palimanan or Cipali (116.8 kilometers) and Semarang'Solo (72.6 kilometers) toll roads.

Then, there are the Jombang 'Mojokerto Toll Road (40.5 kilometers), Surabaya 'Mojokerto (36.3 kilometers) and Pandaan'Malang (38.5 kilometers).

Meanwhile, toll roads in the metro or Jabodetabek area themselves include the Kunciran Section "Serpong or JORR 2 (11.1 kilometers) and Ulujami" Kebon Jeruk or JORR 1 (7.7 kilometers).


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)