JTT Prepares Risk Mitigation During Jakarta-Cikampek Toll Reconstruction
PT Jasamarga Transjawa Tol (JTT) has prepared several risk mitigations amid the reconstruction of five Jakarta-Cikampek Toll Road sections.
These risk mitigations include diverting the flow of traffic affected before the work area, narrowing the work area, preparing contraflows if the traffic conditions are congested, and coordinating with the Highway Patrol Police (PJR) and PT Jasamarga Tollroad Operators (JMTO) in traffic control.
"To ensure that this information is well received by road users, PT Jasamarga Transjawa Tol has also socialized work plans by installing outdoor media in the form of job appeal banners and Variable Message Signs on the Jakarta-Cikampek Toll Road towards Jakarta and Cikampek," said Senior Manager Representative Office 1 PT JTT Amri Sanusi in a written statement in Jakarta, Sunday, July 9.
Meskipun demikian, Amri menyampaikan bahwa sejauh ini ruas Jalan Tol Jakarta-Cikampek arah Jakarta maupun sebaliknya masih beroperasi secara normal.
Meanwhile, JTT as the manager of the Jakarta-Cikampek Toll Road with PT Jasamarga Tollroad Maintenance (JMTM) as the service provider for road maintenance, has again repaired roads on the Jakarta-Cikampek Toll Road to maintain the safety and comfort of toll road users as well as the fulfillment of Minimum Service Standards (SPM) for Toll Road Business Entities.
Details of the date and location of the road repair work on the Jakarta-Cikampek Toll Road as follows:
VOIR éGALEMENT:
1. Friday (7/7) at 21.00 WIB on Sunday (9/7) at 24.00 WIB there was road repair work at Km 13 + 815 to Km 13 + 750 along 55 meters of shoulder lane outside the direction of Jakarta.
2. Monday (10/7) at 08.00 WIB to Tuesday (11/7) at 06.00 WIB there was road repair work at Km 11 +090 to Km 11 + 290 along 200 meters lane 4 towards Cikampek and Km 22 + 575 to Km 22 + 703 along 128 meters lane 4 towards Cikampek.
3. Monday (10/7) at 10.00 WIB on Sunday (16/7) at 05.00 WIB there was road repair work at Km 26 + 261 to Km 26 + 233 lane 1 and shoulders outside the direction of Jakarta and Km 26 + 261 to 26 + 231 lane 1 and lane 2 to Jakarta with a total length of handling 58 meters.
4. Wednesday (12/7) at 08.00 WIB to Thursday (13/7) at 06.00 WIB there was road repair work at Km 11 + 490 to Km 11 + 710 along 220 meters lane 4 towards Cikampek and Km 38 + 499 to Km 38 + 400 along 99 meters lane 4 towards Jakarta.
5. Friday (14/7) at 08.00 WIB to Saturday (15/7) at 06.00 WIB there was road repair work at Km 32 + 911 to Km 32 + 750 along 161 meter lane 4 towards Jakarta and Km 27 + 103 to Km 26 + 990 along 113 meters lane 4 towards Jakarta.
JTT appealed to all road users to anticipate travel, ensure that vehicles are in prime condition, have sufficient electronic money balance, and refuel before starting the trip.