JAKARTA - PT Perusahaan Gas Negara (Persero) Tbk (PGN) together with its subsidiaries continue to demonstrate commitment to supporting national energy security by strengthening the reliability of gas infrastructure through the revitalization of the Muara Karang Onshore Regasification Facility (ORF) owned by PT Nusantara Regas (NR) which has now reached 97 percent progress and is targeted to be completed in March 2026. This facility is a strategic node in the natural gas distribution system for the Jakarta area and its surroundings.
PGN Infrastructure and Technology Director, Hery Murahmanta, emphasized that this revitalization is a proactive step in strengthening a reliable and sustainable energy distribution system, especially in Jakarta as a business activity center with increasing energy needs.
"The revitalization of facilities at ORF Muara Karang is carried out to maintain the reliability and security of the natural gas distribution system, especially in supporting the distribution of gas from the FSRU (Floating Storage Regasification Unit) operated by Nusantara Regas, for various customer sectors," said Hery, in a statement. , Friday, February 13.
The revitalization project includes a number of technical works on the Meter Regulating Station (MRS), ranging from valve overhaul, repair and inspection of measuring instruments, to calibration processes that have received approval from the Directorate of Metrology of the Ministry of Trade. This improvement is projected to increase the effectiveness of MRS operations in supporting gas distribution from FSRU.
"PGN continues to strengthen the readiness of infrastructure to ensure sustainable management of natural gas. This facility update is an important step to ensure that the operating system is always in line with market needs and reliability standards," added Hery.
President Director of PT PGAS Solution (PGN Solution), Sabaruddin, emphasized PGN Solution's commitment to support this project through full collaboration to provide reliable and quality energy and infrastructure services. In addition, this project reflects integrated synergy within the Gas Group Subholding.
"This revitalization is a tangible manifestation of our commitment to prioritizing services to the community, especially in the energy and infrastructure sectors which have a direct impact on the community. Of course, all work processes are also carried out based on established health and safety standards," continued Sabaruddin.
Going forward, the Gas Group Subholding is committed to continuing to strengthen the integration of national gas infrastructure, improving the reliability of the supply chain, and supporting economic growth through the provision of efficient and sustainable energy.
The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)