The Ministry of Public Works and Public Housing (PUPR) said that the distribution of Housing Financing Liquidity Facilities (FLPP) had reached 103,749 units by July 2023.
Director General of Public Works and Housing Infrastructure Financing at the Ministry of PUPR Herry Trisaputra Zuna said the target for housing financing assistance in 2023 includes 220,000 FLPP mortgages, 754,004 Interest Difference Subsidy (SSB) subsidies, 220,000 Face Money Assistance (SBUM) subsidies, and 12,072 units Tapera.
"As of July 7, 2023, FLPP realization reached 47.15 percent, namely 103,749 units, SSB of Rp1.41 trillion, SBUM reached 42.59 percent or 93,701 units, and Tapera as many as 21.73 percent or 2,624 units," said Herry in a written statement, Wednesday, July 12.
In addition, for the progress of the first semester of the Government and Business Entity Cooperation (KPBU) project in 2023, Herry said, in the water resources (SDA) sector there are five projects in the preparation stage, namely PLTM Temef, PLTM Jenelata, PLTM Karalloe, Dam Bodri, and Dam and PLTA in Papua.
Then, from the road and bridge sectors there are four projects in preparation, including the Tuban-Babat-Lamongan-Gresik Toll Road, Cilacap-Yogyakarta Toll Road, Demak-Tuban Toll Road, and Bandung Intra Urban Toll Road (BIUTR). For the housing sector, there is one KPBU scheme project that is in the preparation stage, namely the Surabaya-Tambak Wedi City Flats.
For the residential sector, there are seven projects that are being prepared, namely Kuwil SPAB Integrated with Regional SPAM Bimatara, SPAB Sidan Integrated with Regional SPAM Ayung I, SPAM Bitung, SPAM Regional Sessionheula, Regional SPAM Ir. H. Djuanda/Jatiluhur II, West Karian Regional SPAM, and KPBU Main Stadium North Sumatra.
另请阅读:
"Meanwhile, for the progress of the first semester of the KPBU project in 2023 which is in the transaction stage, there are five projects for the SDA sector, namely the Merangin Dam, Leuwikeris hydropower plant, 40 MW hydropower plant at the Tiga Dihaji Dam, Revitalization and Modernization of the HLD WS Lombok Interconnection System, as well as Optimization and Revitalization of the Commering Irrigation Area based on Sharia Principles," said Herry.
In the road and bridge sectors, said Herry, there are two projects in the transaction stage, namely the Batam-Bintan Bridge and the Trans Papua Road Jayapura-Wamena Segment Mamberamo-Elelim section. Meanwhile, in the residential sector there are also two projects in the transaction stage, namely SPAM Regional Ir. H. Djuanda/Jatiluhur II and SPAM Regional Sinumbra.
"Then, there are six projects in the housing sector in the transaction stage, namely the Cisaranten Bina Harapan Flats in Bandung City, the Spuur Karawang Rental Flats, the SEI Mangkei SEZ Integrated Flats, the WP 1A Hankam IKN Flats, the ASN 1B Flats, and the IKN North Government WP 1A Flats," he concluded.
The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)