أنشرها:

Minister of Transportation Budi Karya Sumadi submitted basic engineering design (BED) documents for the MRT Jakarta route east-west or east-west phase 1 stage 1 to the Acting Governor of DKI Jakarta Heru Budi Hartono. After this submission, Budi emphasized that the MRTeast-west is a national strategic project (PSN) that must be jointly monitored. It is targeted that the construction of phase 3 MRT will be built starting in August 2024. The Ministry of Transportation will continue to support the implementation of rail-based mass transportation development together with the DKI Jakarta Provincial Government. It is hoped that the groundbreaking can be carried out in August 2024,” Budi said at the Ministry of Transportation, Central Jakarta, Monday, August 7. Budi advised the DKI Jakarta Provincial Government to immediately appoint institutions under its control and authority to carry out project development. According to Budi, this needs to be done so that development can be carried out immediately as directed by President Joko Widodo. "I entrust this project to the Directorate General of Railways as the coach of the railway sector to coordinate with relevant stakeholders, including the DKI Jakarta Provincial Government," he explained. Continuing, Heru Budi emphasized that President Joko Widodo had given directions for the East-West MRT to use a development scheme similar to the North-South Line MRT. "“ Reflecting on the success of the construction, operation and business of the North-South Line MRT, and considering the continuity of urban railway transportation development which must be in line with the development in the Jabodetabek area, the East-West Line MRT needs to be ensured. continuity,” said Heru. Currently, the North-South Line MRT has operated 16 kilometers from Lebak Bulus to the HI Roundabout, with the average daily passenger reaching 100,000 per day. In addition to the MRT implementation, the DKI Jakarta Provincial Government has also given a mandate to PT MRT Jakarta (Perseroda) to manage and develop transit-oriented areas (TOD) on the North-South Line MRT to support the shift in the use of transportation from private vehicles to public transportation. "We hope that the development of the MRT Jakarta Phase 3 route will support the development of railway public transportation which has a broad impact on the people of DKI Jakarta and its surroundings," said Heru.
Currently, the institutional consensus of MRT Southeast-West Phase 1, which is a replica of the North-South MRT scheme. In Phase 1 Phase 1, the development of the East-West corridor MRT will cover the route from Tomang to Medan Satria. If the entire corridor is connected, then this corridor will stretch along 90 km from Balaraja in Tangerang to Cikarang, as well as across three provinces, two districts, and three cities.

The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)