JAKARTA - The Ministry of Public Works and Public Housing (PUPR) through the Directorate General of Housing continues to accelerate the construction of 36 units of Ministerial Site Houses located in the IKN Nusantara Central Government Core Area (KIPP).
Director General of Housing, Iwan Suprijanto, said that currently there are at least 32 units of Ministerial Site Land Houses that have been built and greening has also been carried out in plots 104 and 105.
"Currently, there are 32 housing units built and the remaining 4 units will be built soon. We will speed up the construction of the Minister's Office House at IKN and are targeting by mid-2024 all housing units will be built and ready to be occupied," said Iwan in a written statement, as received by VOI, on Tuesday, September 26.
Iwan said that the construction of the house was carried out in parallel with the landscape arrangement. Greening and pedestrian arrangements for pedestrians around the construction site are also carried out so that the environmental condition is maintained and comfortable to live in.
"We also installed solar panels to maximize the use of electrical energy in residential units. We also asked that existing trees not be cut down, while continuing to plant trees so that the environment remains green and beautiful," he said.
A total of 24 units of Persil 104 Ministerial Site Houses were built on an area of 10.6 hectares (ha). Meanwhile, the 12 units of the Minister's Landing House for Persil 105 were built on an area of 9.1 ha. All of them are equipped with infrastructure, facilities, and utilities (PSU), furniture, as well as public and social facilities. The construction work has started since December 2022.
The construction of the Minister's Office Site House is also designed to respond to contoured topographic conditions. The construction of the Minister's Landed House consists of two types of houses that follow the contour of the land, namely the upslope and downslope types.
The 25 upslope-type building is intended for residences located on hill ridges, with the elevation behind the house being higher than the road elevation.
اقرأ أيضا:
Meanwhile, the 11 downslope-type units built are intended for residences on hill slopes so that the elevation behind the house is lower than the road elevation.
Apart from being designed to follow the contour of the land so as to minimize cut and fill, the Ministerial Landing House is also designed to be responsive to climate and disasters. A Smart Design Building system has also been implemented with 100 percent access to the internet and Wi-Fi. so that it becomes an integrated smart area.
The work on the Minister's Office Site House is targeted for completion in 2024. This construction work is one of the supporting infrastructure in preparation for holding the flag ceremony commemorating the 79th Indonesian Independence Day on 17 August 2024 at IKN.
The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)