JAKARTA - The Ministry of Public Works and Public Housing (PUPR) targets the repair of the Jakarta International Stadium (JIS) to be completed in three months in order to support the U-17 World Cup event.

"For the renovation plan, we have started today, the time of three months is not long. We will start planning from now on for the work plan, then we hope that the JIS renovation can be completed in three months and at the time JIS will be assessed by FIFA whether it is feasible or not for the U-17 World Cup event," said PUPR Ministry Spokesperson Endra S Atmawidjadja reported by ANTARA, Tuesday, July 4.

JIS after the renovation will be checked by the Building Safety Committee (KKBG). He also said that basically JIS needs to be improved in several aspects, especially grass, access, parking.

Including several things outside stadiums such as stations or temporary terminals for trains, toll ramps, and pedestrian bridges (JPO) from Ancol.

"We have a FIFA standard Stadium benchmark at Gelora Bung Karno (GBK) and I think we also see input from experts who have been helping us in preparing stadium standards for international events, such as the U-20 World Cup," he said.

However, Endra said that all decisions related to determining which JIS or stadiums would be the location of the match and training for the U-17 World Cup were ultimately determined by FIFA.

"We will meet the standards of FIFA which we did yesterday for the U-20 World Cup. We only offer stadiums and later which stadium will be selected by FIFA, only FIFA will decide. We will try JIS in these three months to be the same standard as the stadiums that we will propose to FIFA," he said.

另请阅读:


- https://voi.id/berita/291558/panglima-tni-soal-tebusan-rp5-miliar-bebaskan-pilot-susi-air-jika-itu-permintaannya-kita-penuhi-demi-keselamatan

- https://voi.id/berita/291527/bukan-soal-pilpres-mahfud-md-berbincang-kenegaraan-dengan-megawati

- https://voi.id/berita/291478/14-wni-tertahan-di-rs-luar-negeri-tertipu-tawaran-kerja-ternyata-kontrak-jual-ginjal

- https://voi.id/berita/291481/ini-4-pembenahan-jis-demi-penuhi-syarat-jadi-venue-piala-dunia-u-17

- https://voi.id/berita/291420/amanda-ungkap-mario-tempramental-emosi-meledak-ledak-selama-berpacaran

Previously, the Minister of Public Works and Public Housing (PUPR) Basuki Hadimuljono estimated that repairing the JIS main one-field grass would cost around Rp. 6 billion. This fee will be budgeted by the Ministry of PUPR in conjunction with the cost of building pedestrian bridge access (JPO) from Ancol.

Meanwhile, Jasa Marga's construction of the Harbour Road (HBR) toll road with the support for the construction of a gate (gate) from the Ministry of PUPR. The DKI Provincial Government, said Basuki, is financing the construction of a pedestrian bridge (JPO) from the electric rail station (KRL) near JIS and the construction of the JIS east door.

Meanwhile, the construction of the station itself is carried out by the State-Owned Enterprises (BUMN) of PT Kereta Api Indonesia (Persero). TransJakarta will also help condition the shuttle area nearby.


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)