Partager:

PT Jasamarga Transjawa Tol conducts road maintenance work with the reconstruction of the military at the Kilometer (Km) 37 points of the Jakarta-Cikampek toll road to maintain the safety and comfort of road users.

"This road repair work is also our effort to meet the minimum service standards of toll road business entities," said Senior Manager Representative Office 1 of PT Jasamarga Transjawa Amri Sanusi Toll Road as reported by ANTARA, Monday, May 15.

He detailed the coordinates of the work starting from Km 37 + 598.7 to Km 37 + 554.7 on the shoulder lane outside the direction of Jakarta with a handling length of 44 meters which was carried out from Monday today to Sunday (21/5) at 05.00 WIB.

Amri ensured that there would be no road closures due to this work. The Jakarta-Cikampek Toll Road, both towards Jakarta and Cikampek, is still operating normally.

His party has prepared risk mitigation, including diverting the flow of affected traffic before the work area, narrowing the work area, and preparing the opposite direction scheme if the traffic conditions of vehicles are congested.

"We are also coordinating with the police, namely PJR (High Road Patrol) and PT Jasamarga Tollroad Operator in an effort to regulate traffic," he also said.

PT Jasamarga Transjawa Tol also socializes work plans by installing outdoor media in the form of job appeal banners and Variable Message Signs in both directions of the Jakarta-Cikampek Toll Road to ensure that information is received properly by road users.


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)