Partager:

GORONTALO - After work was halted due to budget diversion during the COVID-19 pandemic in 2020, the Taluditi–Wanggarasi road repair project was resumed.

The road in Tuweya Village, Wanggarasi District, Pohuwato Regency, Gorontalo, has been intervened since 2019, but the work is only budgeted for nine kilometers.

"In 2022, we will receive another budget and continue the repairs according to my promise. This is a form of gratitude and gratitude for the residents here," said Rusli in Gorontalo, quoted from Antara, Friday, May 6.

The governor, who will retire in the next six days, hopes that the Taluditi-Wanggarasi road can be raised to its status as a national road.

According to him, this is important so that the quality of roads and their repairs can be funded by the central government.

"Like the Randangan–Taluditi road, that is the authority of the province. As long as two kilometers are repaired, but three kilometers are damaged. In the end, we racked our brains, turning it over to be a national road," he said.

The Taluditi–Wanggarasi road which will be repaired has a total length of nine kilometers and a width of 4.5 meters.

PT. Anhal Abadi Bersama as the winner of the tender is required to complete the work for 236 calendar days, with a contract value of IDR 31 billion.


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)