JAKARTA - PT PGN LNG Indonesia (PLI) carried out a Ship-to-Ship Transfer (STS) activity at the Lampung FSRU. This activity is the opening of the operational series of the Lampung FSRU LNG in 2026.
In this STS activity, LNG cargo of approximately 140,500 m³ was delivered from the Donggi Senoro LNG Terminal, Central Sulawesi, using an LNG carrier.
PGN LNG President Director Nofrizal said that throughout 2025, 23 LNG cargoes had been regasified at the Lampung FSRU. Entering 2026, the facility is ready to receive up to 30 LNG cargoes according to the schedule that has been set.
"We ensure that all operational activities of the Lampung FSRU always comply with the commitment to occupational safety and health, so that it runs safely, smoothly, and on time. The Commissioner, Board of Directors, and PGN LNG Officers are ready to work hard to maintain the spirit and commitment in every energy mission for the country," he said, Monday, January 19.
He added, the Lampung FSRU is a floating LNG storage facility managed by PLI, as a subsidiary of PT Perusahaan Gas Negara Tbk. The Lampung FSRU has an LNG storage capacity of 170,000 m³ with a regasification capacity of 240 MMSCFD, which plays a strategic role in maintaining the reliability of the national gas supply.
"As part of the Pertamina Gas Subholding, PLI plays an active role in distributing clean energy for Indonesia and supporting the national energy transition agenda towards Net Zero Emission 2060," he said.
The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)