JAKARTA The short work of construction workers' residence (HPK) phase 2 in the capital city of Nusantara (IKN) is proof of the progress of Indonesia's construction.

In a short time, the 4-story place-off of the building was carried out using a Sandwich Panel.

Using the latest technology, the four-story buildingtoping off process can be completed in a short time, 29 hours 26 minutes 51 seconds.

No wonder this success achieved MURI's record.

Chairman of the Indonesian Modular House Association (ARMI) Nicolas Kesuma said, the Sandwich Panel is a modular construction system developed using steel components that can be combined with other materials.

The 'Sandwich Panel has modules that can be moved and built without the need to use heavy equipment. So that delivery to locations that have limited access can be passed.' explained Nicolas Kesuma in a written statement, Sunday, September 1.

According to Nicolas, this year's steel industry is believed to have significant progress as it is driven by the IKN development project.

Steel market opportunities still show a positive trend in Indonesia through infrastructure development and various building constructions in Indonesia.

"The need for steel is very large, such as metal roofs, light steel frames and others are very much needed. Especially in the future the use of wood will decrease. So steel is the future. Products from steel will be used more and more," said Nico.

The company that has made a big contribution to the development of projects in Indonesia. Both in the industrial, commercial, residential, medical and infrastructure segments. Success in building HPK phase 2 at IKN, is expected to spur the spirit of construction workers. " said Nicolas.


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)