JAKARTA - PT PP Presisi Tbk (PPRE) has completed the lifting of 540 concrete structures consisting of 463 PC-I Girder and 77 Voided Slab on the cinema-jagorawi toll road project.

The project, which was carried out by PT PP Presisi Tbk - PT LMA KSO, has succeeded in lifting all girders and validated slabs spread over 13 location points to maximize the ease of traffic flow in the area.

The Cinere-Jagorawi toll road, which is one of Indonesia's National Strategy Projects, will span a distance of 14.64 Kilometers and will connect traffic-heavy crucial points.

This toll road also connects several toll roads that have been built, namely the Serpong Cinere Toll Road, Depok Antasari Toll Road, Cimanggis Cibitung Toll Road and Jagorawi Toll Road, with the hope that this project can merge the Jabodetabek community congestion.

"The Cinere-Jagorawi Toll Road project, which is one of the proud projects of PT PP Presisi Tbk, is expected to be inaugurated in mid-2023. With the completion of the bridge structure work, this project is getting closer to the completion of project work and PT PP Presisi Tbk is also proud of the trust given to work on this project as the main contractor," said Corporate Secretary of PT PP Presisi Tbk, Adelia Auliyanti, in a written statement, Thursday, February 9.

PT PP Presisi together with its subsidiary, PT Lancarjaya Mandiri Abadi (PT LMA) was chosen as KSO in the work on this project.

The scope of work for PT PP Presisi Tbk starts from land work, drainage work, bridge structure and box traffic/drainage, hard work, toll gate work, mechanical-electric work and other construction work.


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)