BENGKULU - The Bengkulu High Court's Corruption Crime Investigation Team (Pidsus) has named one person, namely Vice President O And M Planning and Control V at PT PLN Indonesia Power, as a suspect in the alleged corruption case of the Musi Hydroelectric Plant, namely Daryanto.
"D was named a suspect in connection with the alleged corruption case of the Replacement of the Main Control System (SKU) of the Musi Hydroelectric Power Plant (PLTA) in Bengkulu Province from 2022 to 2023," said Acting Head of the Legal Information Section (Kasi Penkum) of the Bengkulu Prosecutor's Office, Denni Agustian, quoted by Antara, Wednesday, February 11.
The suspect, who works as an employee of PT electricity company in Indonesia Power and is the Vice President of O&M Planning and Control V at PT PLN Indonesia Power and currently serves as a senior Manager of Engineering Planning UIK SBS in carrying out his authority to draft a procurement planning document for the replacement of the Musi Hydroelectric Power Plant's main control system in 2022 in an illegal manner, drafted a RAB estimate of the price in the planning document of IDR 32 billion.
Head of the Investigation Section of the Bengkulu Regional Attorney General's Office, Pola Martua Siregar, said that the estimated price in the planning stage was used as an engineering estimate and the estimated price itself and became the contract value agreement between PT PLN and KSO Citra Wahana (PT Citra Wahana Sekar Buana and PT Hensan Andalas Putera) for the procurement of main control system equipment of IDR 32.07 billion and has included 11 percent VAT.
With this price, the suspect received a mark-up profit of 10 percent more and has been determined by certain parties.
"Furthermore, for the actual selling price of the SKU equipment from PT Yokogawa Indonesia to KSO Citra Wahana (PT Citra Wahana Sekar Buana PT Hensan Andalas Putera) is only IDR 17.23 billion and has included 11 percent of VAT," he continued.
The act of the suspect has caused an indication of state financial losses as well as an unnatural profit to KSO Citra Wahana which reached IDR 11.66 billion.
Meanwhile, the suspect Daryanto as Senior Manager of Planning & Engineering of UIK carried out the SBS within his authority to draft the planning document for the procurement of the Replacement of the AVR System of the Musi Hydroelectric Plant in 2022 in an illegal manner by drafting the Cost Plan (RAB) with an estimated price by directing the bid of PT Emerson with an estimated price in the planning document of IDR 20.96 billion.
Furthermore, the estimated price in the planning stage was used as the engineering estimate price and the own estimate price and became the contract value agreement between PT PLN and KSO PT Austindo-Truba Engineering for the procurement of AVR system equipment of IDR 20.52 billion.
In fact, the selling price of the AVR equipment from PT Emerson to KSO PT Austindo-Truba Engineering was only IDR 15.79 billion, resulting in a loss of state finances as well as an unfair profit to KSO PT Austindo-Truba Engineering of IDR 2.69 billion.
"There are two eyes of the project from two budget eyes that were carried out by the suspects with a state loss of approximately Rp. 15 billion," said Pola.
For his actions, the suspect was charged with Article 2 paragraph (1) and/or Article 3 of Law Number 31 of 1999 concerning the Eradication of Corruption Crimes as amended by Law Number 20 of 2001 together with Article 18 of the Tipikor Law, as well as related provisions in Law Number 1 of 2023 concerning the Criminal Code.
"The suspect is detained for the next 20 days starting from February 10, 2026 until March 1, 2026, and is placed in the Bengkulu Class IIB detention center," said Pola.