Hauling Road Connected, RMKE Transports 268,000 Tons Of Coal
PT RMK Energy Tbk (RMKE) has successfully completed the construction of a coal hauling road facility that is integrated with loading stations on Mount Megang. With this infrastructure, RMKE can provide coal logistics services from upstream to downstream with coal cargo at Kramasan Port Musi 2. This coal hauling road facility has been connected to two new mines of PT Wiraduta Sejahtera Langgeng (WSL) and PT Duta Bara Utama (DBU).
RMKE President Director, Vincent Saputra said, RMKE managed to load 3.7 million tons of coal until June 2025, including an additional volume contribution from new customers who had been connected to the coal hauling road facility of 268,000 tons.
"This shows the company's ability to maintain service volume despite the decline in demand and global prices," said Vincent, Friday, October 17.
On the other hand, the coal sales segment is still experiencing challenges in reducing coal volume and prices. As of June 2025, RMKE managed to sell 428.6000 tons of coal. The selling price of coal is also still corrected by 6.6 percent yoy.
SEE ALSO:
Although overall operating income decreased by 53.5 percent due to the weakening of the coal sales segment, service revenue showed resilience with growth of 3.5 percent yoy.
The company posted a gross profit of IDR 146.5 billion, of which 75.2 percent came from the service segment. Net profit was recorded at IDR 87.6 billion, reflecting RMKE's ability to maintain profitability in the midst of challenging market conditions.