Realization Of The IKN Budget Capai 57.8 Percent As Of October 25, 2024, Here Are The Details

JAKARTA - Minister of Public Works (PU) Dody Hanggodo said the realization of the capital city development budget (IKN) until October 25, 2024 reached IDR 57.8 percent. The budget allocation for IKN in 2024 is IDR 41.95 trillion.

"For infrastructure support for the State Capital (IKN) in 2024, it is IDR 41.95 trillion. The implementation of physical packages as of October 25, 2024 is 57.8 percent of the 2024 allocation," said Dody 10.9 percent, " said Dody in a working meeting (Raker) with Commission V DPR RI at the Parliament Complex, Senayan, Jakarta, Wednesday, October 30.

In detail, the realization of the budget is used for water resource infrastructure amounting to Rp1.45 trillion. Then, the budget for road and bridge infrastructure is Rp19.2 trillion.

According to Dody, the budget at the Directorate General of Highways was used for the duplication of the Balang Bambang Short II Island Bridge, the construction of access roads to mosques in the IKN area and Logistics Pier.

Then, the construction of the West and East side National Ambu Roads, the Feeder Road in the IKN area, Section 1 Toll Road, Section 3A, Section 3B, Section 5A, Section 5B-1, Section 5B-A, Section 6A, Section 6B and Section 6C-1 as well as the construction of IKN Airport on the runway side.

"Residential infrastructure of IDR 12.93 trillion includes the State Palace Building, the Garuda Palace ceremony of the Coordinating Ministry, the piping network and so on," he said.

This settlement infrastructure is included in the affairs of the Directorate General of Human Settlements who also built the office of the Ministry of State Secretariat, the office of the Ministry of Public Works, the IKN Authority office, government facilities and infrastructure II and the Nusantara Home Area.

Then, the budget is also used to build housing infrastructure of IDR 8.37 trillion. The budget is used for the Ministerial Tax House (RTJM) and flats (rusun) for the National Police, BIN, ASN and Paspampres.

Although it has only reached 57.8 percent, Dody believes that the IKN budget absorption can reach 100 percent at the turn of the year.

The realization of the Ministry of Public Works' budget until October 25, 2024, reached IDR 34.81 trillion. The budget allocation of the Ministry of Public Works this year is IDR 166.99 trillion.

"The realization of the budget until October 25, 2024, is around 60.83 percent or Rp. 101.58 trillion, of which the physical progress is 66.1 percent, the financial progress is around 10.9 percent," he said.