SEMARANG - Officers began sterilizing the toll road from the Kalikangkung Semarang Gate to the west as part of preparations for implementing the one-way system on Tuesday, April 18.
From observations, the closure of the flow of vehicles to the west starts from the entrance to the Krapyak and the Krapyak Interchange which connects the Semarang-Batang toll road and the inner toll road of Semarang City starting at 12.45 WIB.
Officers from the police were on guard at two entrances to the Semarang-Batang toll road and directed the vehicle to exit to the conventional route.
The arrangement of the flow that will enter the Kalikangkung toll gate from the west has also been carried out.
Officers moved the road divider aimed at directing the vehicle at the toll gate.
Head of the Kalikangkung Toll Gate Security Post, Iptu Rudyanto, confirmed the implementation of the sterilization of the route. "Preparation for cleaning," said Rudy, quoted by Antara, Tuesday, April 18.
Sterilization is also carried out on the route from Kalikangkung to the west. Several trucks measuring were seen still driving west during the sterilization process.
The implementation of the simultaneous direction system on the Trans Java toll road starting from Jakarta to the Kalikangkung Semarang toll gate, Central Java, is planned to be implemented today starting at 14.00 WIB. Then engineering there to overcome the density of vehicles for Eid Al-Fitr 2023 homecoming flow.
"The one-way national route is planned to start at 14.00 to 24.00 WIB and be re-imposed on April 19 at 08.00 WIB until April 21 at 24.00 WIB.
The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)