NASA is making final preparations to launch the Artemis II mission, which is scheduled to take place no later than Wednesday, April 1, 2026. This mission will take four astronauts into space.

Artemis II will be the first flight to carry a human crew using the Space Launch System (SLS) rocket and the Orion spacecraft. Although it will not land on the Moon, these four astronauts will pave the way for the next landing mission.

The four astronauts have arrived at the Kennedy Space Center, Florida, since Friday, March 27, 2026. They have undergone a strict quarantine period to ensure that their physical condition is good enough before the launch is carried out.

NASA weather experts reported an 80 percent chance of launch conditions in the Florida region. However, NASA is still monitoring the potential for strong winds and cloud cover that could affect the launch window.

The launch window will open for two hours starting at 18.24 local time with supervision from the mission control center. All technical preparations, including checking the Orion Crew Survival System special space suit, have been completed.

Astronauts Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen will be the first humans to fly back to the Moon's orbit in decades. The mission will test all life support systems in spaceflight.

Through the success of Artemis II, NASA hopes to build a stronger foundation for scientific exploration. In addition to landing back on the Moon, NASA is also building a longer-term goal, namely carrying out the first manned mission to Mars.


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)