The Ministry of Public Works and Public Housing (PUPR) is accelerating the completion of the 64.5 km Indralaya-Prabumulih Toll Road construction. This toll road is part of the Trans Sumatra (JTSS) Toll Road in South Sumatra.

"Currently, the construction progress has reached 98.89 percent," wrote the Ministry of PUPR on its official Instagram account @kemenpupr, Monday, July 17.

The acceleration of the completion of the toll road is in line with the functional test last June. This feasibility test serves to ensure aspects of safety, traffic management, road facilities, and complementary buildings.

Meanwhile, the scope of the inspection includes the 0+000-STA 64+500 mainroad and On Ramp towards Muara Enim on the A route, and the 64+500-STA 0+000 main road and Of Ramp from the Muara Enim direction on the B route.

Later, this toll road will pass through Palembang City, Ogan Ilir Regency, Muara Enim Regency, and Prabumulih City.

For your information, the Indralaya-Prabumulih Toll Road is managed by PT Hutama Karya (Persero) as the Toll Road Business Entity (BUJT). This toll road was previously operated functionally at the time of Eid 2023.

When this toll road is completed, it is estimated that it will only take one hour from Palembang to Prabumulih.


The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)