JAKARTA - The DKI Jakarta Provincial Transportation Office has started to implement traffic engineering in the area of Jalan Prof. Dr. Latumenten and Jalan Makaliwe Raya, West Jakarta, as the Latumenten Flyover (FO) construction project enters the delivery stage until the erection of the girder.
Traffic engineering is carried out in stages from May to early June 2026. The diversion of traffic mainly applies to large vehicles passing through the Grogol, Roxy, Daan Mogot, and Season City areas at night and early morning.
Acting Head of the DKI Jakarta Transportation Office Ujang Harmawan said that construction work was carried out on Jalan Prof. Dr. Latumenten and Jalan Makaliwe Raya, Jelambar Village, Grogol Petamburan District, West Jakarta.
"In connection with the erection work of the Latumenten Flyover (FO) construction girder, the West Jakarta Administration City, the DKI Jakarta Provincial Transportation Office is carrying out traffic engineering," said Ujang in his statement, Wednesday, May 13.
The first phase includes the delivery and lowering of PC-U girders on the west side of Jalan Prof. Dr. Latumenten on May 7-11, 2026 at 22.00-04.00 WIB. Furthermore, the work shifted to the east side of Jalan Dr. Makaliwe Raya on May 14-18, 2026 at the same time.
After that, the erection of the girder began on the west side of Jalan Prof. Dr. Latumenten on May 18-26, 2026. Meanwhile, the erection on the east side of Jalan Dr. Makaliwe Raya is scheduled to take place from May 29 to June 5, 2026.
DKI's Dishub prepared a number of traffic diversions during the project. Large vehicles from the direction of Flyover Grogol, Roxy, and Daan Mogot to the north were diverted through Jalan Daan Mogot to Jalan P. Tubagus Angke.
Meanwhile, small vehicles are directed to pass through a number of alternative routes such as Jalan Hadiah, Jalan Dr. Susilo, Jalan Dr. Muwardi to Jalan Semeru.
On the other hand, large vehicles from north to south will be diverted to turn back before Season City to Jalan P. Tubagus Angke and Jalan Daan Mogot. Meanwhile, small vehicles can still pass through Jalan Semeru and Jalan Dr. Susilo I.
"Road users are asked to adjust the traffic arrangements set, comply with traffic signs and instructions from officers in the field, and prioritize traffic safety," said Ujang.
DKI's Dishub also emphasized that the contractor responsible for the project was fully responsible for the safety of road users during the work.
"PT Modern-LAPI GU KSO as the contractor for the integrated construction work of the Latumenten Flyover on Jalan Prof. Dr. Latumenten and Jalan Makaliwe Raya is fully responsible for the safety and security of road users (motorized and unmotorized) at the work site," he added.
The English, Chinese, Japanese, Arabic, and French versions are automatically generated by the AI. So there may still be inaccuracies in translating, please always see Indonesian as our main language. (system supported by DigitalSiber.id)